Project: An Long Food Company
Location: Ben Luc – Long An
Main contractor: Dong Tay JSC
Scope of work: Fabrication and installation of 02 cooking oil storage tanks 500m3 with 7.7m diameter and 10m high
Duration: 2 months (2009)
Project: An Long Food Company
Location: Ben Luc – Long An
Main contractor: Dong Tay JSC
Scope of work: Fabrication and installation of 02 cooking oil storage tanks 500m3 with 7.7m diameter and 10m high
Duration: 2 months (2009)
Project: SOPET GAS
Location: Nhon Trach – Dong Nai
Main contractor: Doosan Heavy Industries
Scope of work: Erection of 02 sphere LPG tanks with 14.8m diameter and 46~51mm thickness
Duration: 6 months (2008)
Project: Vedan power plant
Location:
Scope of work: Installation of venting & dust filtering system
Duration:
Value of contract:
Project: Jungwoo Vina
Location:
Scope of work: Fabrication and installation of machinery and steel base system
Duration:
Value of contract:
Project: Hualon Vietnam factory
Location:
Scope of work: Installation of machinery
Duration:
Value of contract:
Project: Thai Binh 2 Power plant
Location: My Loc Ward, Thai Thuy District, Thai Binh Province.
Scope of work: Installation of steam turbine, generators, auxiliary equipment 600MW for power plant.
Duration: 8 months
Value of contract: 31.488.019.304 VND
Project: Dong Nam Petro Project
Location: Dinh Vu Industrial zone, Dong Hai Ward, Hai Nam District, Hai Phong City, Viet Nam
Scope of work: Supply of materials, fabrication, manufacture and installation of storage tanks, steel structures.
Duration: 4 months
Value of contract: 5.300.000.000 VND
Project: Hyosung Dong Nai Project
Location: Nhon Trach 5 Industrial zone
Scope of work: Fabrication, manufacture and installation of Hyosung storage tanks
Duration: 4 months
Value of contract: 2.500.000.000 VND