Project: Vina Kraft Paper Company
Location: My Phuoc 3 Industrial Zone – Ben Cat – Binh Duong
Main contractor: Chien Thang Engineering
Scope of work:
– Installation of steel structure
– Equipment Installation: Boiler (130 ton/hr), steam drum, steam turbine, electrostatic precipitator, stacks
Installation of Piping system and Ducting system
Duration: 12 months (2010)